Dear Rob Sharp,

This is the WalkSydney submission on the Western Distributor Road Network Improvements (from Anzac Bridge to the Sydney Harbour Bridge) Review of Environmental Factors (Sep-Oct 2022).

WalkSydney is the peak advocacy group working to make it easier, safer and more pleasant to walk in Sydney. WalkSydney’s vision is that “Walking will be convenient, accessible, safe and enjoyable for everyone.”

With a growing population we need to ensure people can easily walk, ride and catch public transport to local shops, services and places. We are very concerned about the Western Distributor project and its impacts on walking, riding bikes and the streets of the Pyrmont peninsula. We want TfNSW to abandon this proposal and instead prioritise investment in Pyrmont/Ultimo consistent with the Place Strategy, ahead of investing in motorway related improvements.

Why is TfNSW proposing this scheme now?

Westconnex will open in less than 6 months. TfNSW says

“the benefits of Stage 3 are improving motorway access and connections to Western Sydney and key employment hubs across the city, moving traffic and heavy vehicles to the underground motorway, reducing traffic on local streets and creating opportunities for urban renewal.”

If Westconnex is already providing these benefits why do we need this proposal? Is TfNSW changing its assessment of the benefits of Westconnex? Will Westconnex fail and traffic and heavy vehicles not move to the underground motorway? Conversely, if these changes are required because WestConnex is now predicted to funnel more traffic into Pyrmont, do you consider it a good solution to make ‘two wrongs’ to address this?

What is the project justification? “Traffic queues and traffic growth”

TfNSW have invested in the new Western Sydney Metro with a new station to provide rapid and efficient access to jobs, homes and places in Pyrmont. Regional travel demand growth previously addressed by the Western Distributor will transition to a more efficient mass transport option in Pyrmont, and regional travel will have access to the WestConnex motorway. Making walking and cycling more unattractive in Pyrmont will undermine this investment in Pyrmont as a place, as well as Metro as a mode

The proposal makes it seem TfNSW is not serious about walking and cycling

By removing pedestrian crossings, this proposal pumps more traffic into one of the most densely populated areas in Australia. Removing buffers from fast moving traffic (parked cars), removing and widening pedestrian crossings, removing trees are direct impacts on people walking along the main pedestrian spine of the peninsula. Impacts on the main pedestrian entrance to Darling Harbour – Tumbalong Boulevard – are no less severe.

Pyrmont should be a model for achieving the strategic vision outlined in the Future Transport Strategy, not a ‘Back to the Future’ own-goal prioritising more cars.

Vision Zero is a cornerstone of TfNSW strategic investment, this project is about traffic efficiency not safety

While stating there are crashes in the REF, no analysis of how these will be mitigated is provided, and the scheme is based on flawed or inaccurate data and calls in question TfNSW commitment to Vision Zero when it prioritised an investment on a small section of a motorway above other road safety interventions such as 40km/hr across Sydney. Between 2007 – 2020 more than 30 people were killed crossing streets in the CBD. There are five times as many people walking in the City as driving cars on motorways, why aren’t we investing a similar amount to save lives of people walking? TfNSW’s own economic investment guide requires road safety investment in the most important places.

The project is not compatible with a “place-based approach” per the Pyrmont Place Strategy

Failure to align with Government endorsed strategic plans, the place vision and the local transport context is a serious flaw in the development of the proposal. The NSW Community rely on transparent and robust planning processes to guide land use changes that should then shape transport investment. The proposal has adopted a traffic solution to land use change and population growth, even though there is a place strategy that proposed a completely different approach. This type of opaque decision making process undermines the Community’s trust in Government to make good decisions.The PPPS transport strategy includes outcome E – reallocate road space away from private car – and to pedestrians. It discusses the role of Harris St, a key activity street, classified as a local street (M&P Framework) with high walk/cycle mode share. The proposal ignores this outcome and proposes removal of a pedestrian crossing and buffer to pedestrian space, as well as inhibiting future footpath widening and dedicated bus and cycle lanes.

Why should local Communities trust the Government to make decisions on their behalf if these commitments can be ignored by highway and traffic engineers without regard for local places and transparent processes?In particular, the proposal contradicts or hinders the following elements of the PPPS:

We are in a climate emergency – loss of tree canopy is not acceptable

The highly urbanised peninsula has relatively low canopy cover and any further loss stands to worsen urban heat and reduce walkability. The project recognises that the significant trees in Zone K (Tumbalong Boulevard, Darling Harbour) are to be lost. No design options appear to have been done to reduce this impact.

Zone G – the intersection of Allen St and Harris Street – stands to lose 10 fully-mature street trees on the north and western sides of the intersection (Appendix C, p43). These shade the western-side pedestrian crossings during lunch and from hot afternoon sun in an area of active frontage – the preferred side of the street for locals and providing the greatest amenity – local fresh food and food retail. There is no mitigation proposed for this intersection, and this will significantly worsen walkability in this area (as will wider crossings on these junction arms).

The current flooding disaster across Victoria, northerns and western NSW highlights how important trees are to reducing the impacts of CO2 emissions. It is not acceptable to cut down trees for cars to park, construction compounds and projects that enable greater volumes and faster car travel.

The consultation is inadequate

The online REF feedback mechanism is inadequate. The online form and a single paragraph box, without proper mechanism for detailed comments about the proposal is flawed. The feedback form will restrict and inhibit objections. We understand that limited agency consultation was undertaken prior to public exhibition – and limited to only defined components of the project such as the ANZAC sculptures.

While general public consultation was inadequate, were commercial interests privately consulted separately? We insist that all communications with commercial interests, including toll road operators, about this project be made public.

It is ironic that the Executive Summary mentions “consultation fatigue” – it is unclear why this project would be up for consultation when previous iterations of the same project have already been rejected.

The proposal does not represent value for money

In contrast if this money was spent on place enhancements as described in the Pyrmont Place Strategy or the Tech Central Transport Plan, the livability, economic productivity and safety of all transport users, including people walking, would be improved. For example: the footpath along Bridge Road is less than 2m wide in some sections, and does not provide comfortable and safe space for people walking, and will significantly worsen with the opening of Metro, Fish markets, and the Blackwattle Bay development.

Pyrmont Bridge, a significant transport heritage item, remains in very poor condition, despite its recognised strategic merit in providing local connectivity to the Bays West. Without reallocation of road space from vehicles to people, walking to the Pyrmont Metro will be more difficult, encouraging more vehicle

A place-based approach to transport funding should have identified these options in the Strategic Business case phase – Gate 1 as preferable to the proposal.

TfNSW must undertake a transparent and thorough investigation to solve Pyrmonts growing transport demands

WalkSydney recommends that the project does not proceed. Any investment in Pyrmont/Ultimo should focus on improvements consistent with the Place Strategy, and the current Pyrmont Transport Plan over any other motorway related improvements.

Thank you for taking the time to read our feedback.

Yours sincerely,
Lena Huda


President, WalkSydney